South Korea
TT43 Smart Double Loop wind tunnel is now under construction for The Ministry of Defence of South Korea.
Diameter | 4.3 m 14.1 ft |
---|---|
Model | TT43 Smart Double |
Opening | 2024 |
TT43 Smart Double Loop wind tunnel is now under construction for The Ministry of Defence of South Korea.
Diameter | 4.3 m 14.1 ft |
---|---|
Model | TT43 Smart Double |
Opening | 2024 |